MANUFACTURING · PROJECT CASE STUDY

High Dusting at a Fremont Manufacturing Facility

High dusting in a manufacturing building involves more than reaching an overhead surface. Access equipment, the equipment below the work area and the facility’s operating schedule all affect how the project is planned.

This System4 project sheet documents high dusting at a Fremont manufacturing facility in March 2024. The on-the-job photos show equipment protection, lift access and overhead cleaning.

Project at a Glance

FacilityManufacturing facility
LocationFremont, California
Project dateMarch 2024
ServiceHigh dusting of overhead areas
AccessBoom/scissor access and extension tools
CoordinationEquipment protection and sequencing around production shifts

The Planning Challenge

The work had to account for production equipment below overhead areas, high-bay duct runs and spaces where a lift could not provide access. The project sheet emphasizes planning access around floor loading and coordinating the sequence around production shifts.

Protecting the Areas Below

Production equipment and lines were covered before overhead work. The documented scope also included uncovering and checking the protected areas and removing debris after the work.

Matching Access to Each Overhead Area

The project used lift access for high-bay runs and extension tools where a lift could not reach. The photographed work includes roof structure, duct runs, spiral duct surfaces and plenum tops.

  • Equipment and line protection before work, followed by uncovering and checking.
  • Boom and scissor access planned around floor loading.
  • Extension tools for spans a lift could not reach.
  • Fall protection and hard hats for elevated work.
  • Sequencing around production shifts.
  • Debris removal and floor cleanup.

These are details from this project; each facility requires its own plan.

On the Job in Fremont

These work-in-progress photos show how the team protected equipment and reached overhead areas.

Production equipment covered before high dusting
Production equipment sheeted before work starts.
Boom lift staged for high-bay work
Boom lift staged for high-bay runs.
Extension tools used for overhead cleaning
Extension tools where a lift will not fit.
Cleaning roof structure and ductwork
Working the roof structure and duct runs.
Spiral duct cleaning from an elevated platform
Spiral duct wiped down from the platform.
Worker detailing plenum tops by hand
Plenum tops detailed by hand.

Planning High Dusting for Another Facility

A walkthrough should identify overhead surfaces, access constraints, equipment or inventory below, available work windows and the boundaries of the cleaning scope. The method for this Fremont job should not be assumed suitable for every building.

Get Free Quote

High Dusting and Industrial Cleaning in the East Bay

Review our commercial high-dusting services for the regional service overview. For a broader facility program, see industrial cleaning in Fremont.

Download the Project Sheet

See the original overview and on-the-job photos from the March 2024 project.

View the Fremont High-Dusting Project Sheet (PDF)

Plan Overhead Cleaning Around Your Operation

Tell System4 about the overhead areas, equipment below, access restrictions and preferred service window.

Request a High-Dusting Walkthrough

Or call (925) 592-6001.

Browse more commercial cleaning case studies.

Scroll to Top

Schedule A callback or walkthrough

GET A FREE NO-OBLIGATION QUOTE

Didn’t see your location, service, or industry? We offer a variety of services all across the San Francisco Bay Area.

Fill out the form below, and we will be in touch shortly.

Contact Information